07 Temporary Works

Temporary Works Design, Propping, Shoring & Support

At Vanguard Engineers, excavations, demolitions and structural alterations often need temporary works — propping, shoring, or support — to keep a site safe while work is underway. We design temporary works schemes engineered to the specific conditions of your project, covering Essex, East London and nationwide.

Safe support while the permanent works go in

Temporary works keep the structure stable during wall removals, beam installs, openings, demolition of part of a building, or concrete pours. We design propping, shoring, needling, formwork, and scaffolding ties to BS 5975, with drawings and sequencing guidance for site.

The package is engineer-approved so contractors can implement temporary support with clear layouts, fixings, and method notes.

Included in this service

  • Site visit or remote review of drawings, photos, and construction sequence
  • Assessment of loads, stability, and construction risks
  • Design of propping, needling, shoring, or temporary beams
  • Scaffolding tie design, bracing, or temporary frame design
  • Formwork and falsework design for slabs, beams, or retaining structures
  • Temporary stability checks for walls, floors, and roof elements
  • Structural drawings showing layout, supports, fixings, and installation details
  • Written method and sequencing guidance with design certificate where required

When this applies & how we work

Typical situations

  • Removing or altering a load-bearing wall during construction
  • Installing steel beams or lintels with temporary support required
  • Creating new structural openings in existing buildings
  • Demolition of part of a structure with retained elements
  • Concrete works requiring formwork or falsework design
  • Scaffolding that relies on structural ties to the building

Process

  • 01
    ReviewDrawings, photos, and construction sequence assessed
  • 02
    Site visitAccess, loads, and constraints inspected where required
  • 03
    DesignPropping, shoring, needling, or temporary frames designed
  • 04
    DeliveryComplete signed temporary works package issued

Need temporary works design?

Share your drawings and construction sequence — we’ll confirm scope and deliver an engineer-approved package.